ALPINE® Liquid Fertilizer
ALPINE® Liquid Fertilizer
  • Home
  • Products
  • Equipment
    • ALPINE Application Equipment
    • ALPINE’s Precision Planting Equipment Rebate
    • D16-15 ALPINE Injection Kit
    • Bulletins
    • Catalogues & Manuals
    • Spring Cleaning
  • Agronomy
    • Maximizing Fertilizer Efficiency- Main
    • Plot Results
    • ALPINE Advance
    • Bio-K®: A Unique Potassium Technology
    • General Agronomy
    • Foliar Nutrition
    • 4R Nutrient Stewardship
  • Blog
  • Events
    • Calendar
  • About Us
    • History
    • Sales Team
    • Manufacturing Locations
  • Contact

Kit Instructions (East)

Home > Bulletins > Kit Instructions (East)

By: artem

Comments: 0

All bulletins

READ FULL INSTRUCTIONS BEFORE ASSEMBLING

      1. Hand-tighten (very tight) all manifold connections. Manifold may be mounted vertically or horizontally. Horizontally is the preferred set up with the orifice pointing up.
      2. Loop 1/4″ hose out from orifice connection on manifold, around and under the manifold, through the hold provided. This stops the hose from being kinked at orifice connection.
      3. Calibration
          • Ensure that the pressure relief valve is screwed out halfway when you prime the system, so you don’t wrap the gauge all the way around and damage it when the system takes its prime.
          • Loosening off one manifold twist nut (large black @ end of manifold) will allow for easier priming of the system – this removes the check valve backpressure. Tighten manifold twist nut once prime has been gained.
      4. Ensure the fertilizer placement tube is located not so low that it gets hit with dirt or the airflow. Run the 1/4”tubing hose out the bottom of the steel tube for 1/2”.
      5. Always follow hydraulic lines, seed tube or wiring harness on drills when running the 1/4” or 3/4” tubing.
      6. Place the 1 1/2” strainer before the pump and a 3/4” valve on the suction side of the strainer, to allow for easy cleaning. On air drills, with the automatic seed/dry fertilizer calibration feature, place a 3/4″ valve after the pump and close during the automatic calibration procedure, allowing Alpine to bypass and not be lost.
      7. Valve the bottom of the liquid tank on the air drill and close it every night. Do not rely on the check valves, in the manifold, to hold product in the tank over night.
      8. The pump can turn either way but must be mounted upright.
      9. Spray lubricant into steel tubes before putting 1/4” tubing in. This helps prevent the tubing from seizing into the tube over time.
      10. Oil level in pump should only be filled to very bottom of the dip stick. Don’t fill any higher than the indicator on the dip stick.
      11. 2” strainer/80 mesh screen should be used in storage tank & transfer tank to field (not included in kit).
      12. The air valve on pump requires 0 psi. It is NOT for blowing out the pump … only used at very high pressures.

 Should you have any questions regarding the above, please contact your local dealer or your ALPINE District Sales Manager

For a PDF document of these instructions, click here.

Installing an ALPINE kit on a corn planter Part 1

Installing an ALPINE kit on a corn planter Part 2

Installing an ALPINE Kit on a corn planter Part 3

Installing an ALPINE kit on a corn planter Part 4

« Previous
Next »
Sidebar
Featured Products

ALPINE Liqui-Cal®, Foliar Nutrition

ALPINE G241-S®, In-Furrow Starters

Recent Posts
ALPINE® BRAND CELEBRATING ITS 50TH ANNIVERSARY IN 2023. 02 Mar 2023
New Hamburg Press Release 20 Dec 2022
Blog Categories
  • Agronomy
  • Announcement
  • Equipment
  • Odds and Ends
  • Opinion
  • Region East
  • Region West
  • Uncategorized
ALPINE® Liquid Fertilizer

Nachurs Alpine Solutions® was established in 1946 and is considered the industry standard in seed placed liquid fertilizer throughout all of Canada.

QUICK LINKS

  • Events
  • Careers
  • Our Sales Team
  • Environmental Compliance
  • Privacy Policy
  • Terms & Conditions

Latest Posts

  • ALPINE® BRAND CELEBRATING ITS 50TH ANNIVERSARY IN 2023. March 2, 2023
  • New Hamburg Press Release December 20, 2022
  • The ALPINE Difference: Nutrient Solubility September 28, 2022

CONTACT US

Head Office

30 Neville Street, New Hamburg, Ontario, Canada, N3A 4G7
1-800-265-2268
info@alpinepfl.com
Monday - Thursday: 8 am - 5 pm EST. Friday: 8 am - 4 pm EST

©2023 Nachurs Alpine Solutions Inc.® All rights reserved. Staff Login

Created by: UBM

Please share your location to continue.

Check our help guide for more info.

share your location